Passa alle informazioni sul prodotto
1 su 26

Omaha Sports & Games

BenchK 700 Gymnastics Ladder - Wooden Wall Bars with Metal Frame

BenchK 700 Gymnastics Ladder - Wooden Wall Bars with Metal Frame

Prezzo di listino $689.00 USD
Prezzo di listino $800.00 USD Prezzo scontato $689.00 USD
In offerta Esaurito
Spese di spedizione calcolate al check-out.
Color
Quantità

BenchK 700 Gymnastics Ladder Wooden Wall Bars with Metal Frame


Description

The BenchK 700 Gymnastics Ladder is a premium wall-mounted fitness system that combines the strength of steel with the natural beauty of solid beech wood. Designed for modern interiors, it delivers a refined balance of durability, functionality, and minimalist style. This wall bar system features nine solid beech rungs that provide a reliable surface for strength training, stretching, and mobility exercises.

Each wooden rung is hand-oiled with organic linseed-based oil to preserve its natural texture and ensure a smooth, comfortable grip. The steel frame is engineered with precision laser-cut details and protective inserts to enhance both durability and aesthetics. Its compact wall-mounted design makes it suitable for home gyms, studios, and wellness spaces where efficient use of space is important. Built to European safety standards, the BenchK 700 offers a dependable and long-lasting solution for daily fitness training. (Product Manual and Installation Instructions Below)


Key Features

Steel and Beech Wood Construction: Combines a durable steel frame with nine solid beech wood rungs for strength and stability

Premium Hand-Oiled Finish: Wooden rungs treated with organic linseed oil to preserve natural texture and ensure a smooth grip

9-Rung Design: Provides a full-length climbing and training surface for stretching, mobility, and strength exercises

High Weight Capacity: Supports users up to 150 kg (330 lbs) for reliable everyday training

Precision Engineering: Laser-cut steel components with plastic bush inserts for added durability and protection

Compact Wall Mounted System: Designed for efficient space usage in home gyms and modern interiors

Overall Dimensions: Measures 240 cm (94½″) high and 67 cm (26⅜″) wide

European Safety Certified: Conforms to PN-EN 12346:2001 and PN-EN 913:2019-03 standards

Modern Matte Finish: Black matte steel frame delivers a clean and contemporary appearance

Long-Term Warranty Coverage: Includes a 10-year warranty on metal elements and 2-year warranty on other components

View BenchK Series 7 Manual


Shipping

Ships free! Please email us at service@omahasportsandgames.com for a delivery ETA or to confirm shipping details.


Why You’ll Love It

The BenchK 700 brings a modern, design-focused approach to traditional wall bars while maintaining professional-grade performance. Its combination of steel and natural beech wood creates a durable system that fits seamlessly into contemporary home and studio environments. Users appreciate the smooth hand-oiled finish, which enhances comfort during stretching and bodyweight training. The 9-rung layout supports a wide range of exercises, from mobility work to full-body strength routines. Its compact footprint makes it ideal for maximizing training potential without sacrificing living space. Built for long-term reliability and certified to European safety standards, this wall bar system delivers consistent performance for everyday fitness needs.


Product Specifications

  • The set includes: wall bars (gymnastic ladder)
  • Maximum user weight: 150 kg (330 lbs)
  • Width: 67 cm (26 3⁄8″)Height: 240 cm (94 ½″)
  • Weight: 20kg (44 lbs)
  • Minimum installation height: 250 cm (98 ½″)
  • Mount type: to wall
  • Color: Black or White
  • Material: steel, beech wood
  • Warranty for metal elements: 10 years
  • Warranty for other elements: 2 years

Visualizza dettagli completi
No reviews yet, Be the first to review this product

Powered by ViVA Reviews